Mixed Model Sequencing – Basic Example Workload and Buffering

Mixed Model Sequencing – Basic Example Workload and Buffering

By Discovery Lean Six Sigma

0/5 stars (0 votes)

Adjusting the production sequence is a popular way of handling production lines with a product-dependent workload. This post is part of rather long series on Mixed Model Sequencing. In the last post I discussed the basics of sequencing and the calculation of the takt time. This post describes the basics of adjusting workload and buffering … Continue reading Mixed Model Sequencing – Basic Example Workload and Buffering



Original: https://www.allaboutlean.com/mixed-model-sequencing-5/
By: Christoph Roser
Posted: June 18, 2019, 11:00 am

comments powered by Disqus

Discovery Lean Six Sigma

Dummy user for scooping articles

I'm a dummy user created for scooping  great articles in the network for the community.