Toyota Standard Work – Part 3: Standard Work Layout

Toyota Standard Work – Part 3: Standard Work Layout

By Discovery Lean Six Sigma

0/5 stars (0 votes)

This post is the third in this series on how Toyota plans standard work. The first one was the production capacity sheet to define what capacity you have available. The second one was a standard work combination table to define when the operator is doing what. Finally, the third of the “famous three slips”, presented … Continue reading Toyota Standard Work – Part 3: Standard Work Layout



Original: https://www.allaboutlean.com/toyota-standard-work-part-3/
By: Christoph Roser
Posted: July 3, 2018, 11:00 am

comments powered by Disqus

Discovery Lean Six Sigma

Dummy user for scooping articles

I'm a dummy user created for scooping  great articles in the network for the community.