Different Ways to Establish a Pull System – Part 2

Different Ways to Establish a Pull System – Part 2

By Discovery Lean Six Sigma

0/5 stars (0 votes)

Different Ways to Establish a Pull System – Part 2

This is the second post on different types of pull production. It features the less commonly known approaches of triangle kanban, drum-buffer-rope, reorder point (surprise, yes, it is a pull system),  reorder period (also a pull system), and FIFO lanes. In my previous post I showed you the kanban system and its variant, the two-box … Continue reading Different Ways to Establish a Pull System – Part 2 →



Original: http://www.allaboutlean.com/different-ways-to-pull-system-2/
By: Christoph Roser
Posted: August 8, 2017, 11:00 am

comments powered by Disqus

Discovery Lean Six Sigma

Dummy user for scooping articles

I'm a dummy user created for scooping  great articles in the network for the community.