What to Do with SMED: Reduce Lot Size or Increase Work Time?

What to Do with SMED: Reduce Lot Size or Increase Work Time?

By Discovery Lean Six Sigma

0/5 stars (0 votes)

What to Do with SMED: Reduce Lot Size or Increase Work Time?

SMED (Single Minute Exchange of Die) is a very useful tool to reduce changeover time. Reducing changeover time will free up time for other uses. Western management often wants to use this time to produce more goods. However, the rule of thumb at Toyota is to use this newly available time to do more changeovers … Continue reading What to Do with SMED: Reduce Lot Size or Increase Work Time? →



Original: http://www.allaboutlean.com/smed-lot-size-or-work-time/
By: Christoph Roser
Posted: May 23, 2017, 11:00 am